Rail Division

Greenway supply most grades of Sentinel competencies such as Engineering Supervisors, COSS’s, Lookout’s and PTS trained civil and cable operatives.

A major part of our work is driven by the capacity to support our ETE activities and we do this by assisting in the processes of switch out’s with our HVCP teams and others holding various levels of permits.

Tasks undertaken includes:

Permanent Way Activities
Our Permanent Way teams come equipped with the experience to assist you with sleeper changes, base plate changes, IBJ install’s and all other minor and major track activities. Our qualified and competent teams will have small tools and all our gangs can be provided with hand tools to make your job that little bit easier.
Electrical Track Equipment Works (ETE)
Supporting some very reputable clients we provide all types of skill sets such as High Voltage Competent Persons and experienced ETE installers.
Electrical Track Maintenance Works (ETM)
Our teams install all sizes of Conductor Rail including the installation of insulated holding pots and protective guarding. We are fully conversant with the standards set for ensuring smooth contact from train shoe to conductor rail and have assisted on projects such as South Alliance, Thameslink KO1 & KO2 and Reading Capacity Upgrade.
Cable Containment - Troughs and GRP Routes
We are experienced in elevated troughing and have teams that can both install posts and do exact cuts to Network Rail Standards. Our teams can be deployed to install all manner of routes at a fast pace which will ensure your project runs both on time and on budget.
Cable installations on Network Rail Infrastructure
We can deliver all aspects of installation throughout the night or day ensuring safety and quality. We currently have active teams installing cables on some major projects in the UK such as Crossrail and The Great Western Electrification Programme. Whether it is a 33kv cable or small fibre cable we can offer a full service from start to finish.
Sleeper changes including CMS
This activity is becoming more and more popular on the Network Rail Infrastructure due to the way it protects the cable and is ultimately a safer option to contain cables that run across track. Our teams have installed many cable management sleepers throughout the South of England and understand all aspects of the install from ensuring measurements are correct and ensuring kangoo packing is completed to a high standard to ensure track stability when trains pass once handed back.
Substation Works
We offer lots of different skill sets with all the necessary types of entry permits to substations that can be used for surveying or other working activities. We have been involved in all aspects of Substation builds from initial groundwork’s right through to wiring of units and lighting. We can supply confident teams to assist you in whatever substation works you are undertaking.
Platform Civil Operations
Our teams can perform all different types of works from tarmac install to duct and cable install, we are familiar with the dangers and challenges that come when working on station platforms. Our civil teams are aware of standards when installing new walk ways and can also install the new re-enforced platform extensions that are being installed at the moment.